Petco Park Baseball Stadium Retrofits an Energy Storage System to Compliment their Existing Solar System
by Erin Christensen on Jul 05, 2022
demand response
demand response program
petco park
top posts
PROJECT SUMMARY
THE CHALLENGE
Petco Park, home of the San Diego Padres, wanted to deploy a behind-the-meter energy storage system (ESS) as part of a demand response integration pilot program with the local utility company. Petco has a strong track record of sustainability, gaining attention in 2016 when they switched to LED lighting for the stadium, becoming the first ballpark in the National League to do so. Then in 2018, Petco Park installed a 336 kilowatt (kW) solar array, one of the largest solar projects at a major league baseball stadium at the time. In their continued commitment to renewables and sustainability, Petco enlisted Baker Electric, one of California’s leading full-service solar + storage contractors, to retrofit an ESS to their existing PV system. The ESS system was required to meet Petco’s exacting standards for design and safety without disrupting their normal business operations. Baker also faced the challenge of procuring and commissioning a turnkey energy storage system from a proven vendor on a relatively tight timeline.
THE SOLUTION
Baker Electric, a long-time ETB Developer user, turned to Energy Toolbase for assistance in procuring and commissioning a turnkey energy storage system. The Petco Park project was part of a four-site portfolio where Baker would deploy ESS as part of a demand response integration pilot program with the local utility company. Baker required the ESS hardware to be delivered on a predetermined schedule, with fully integrated EMS controls software, and for the ESS provider to be an established and bankable vendor. Baker procured a BYD Chess 120 kW, 2-hour unit, fully integrated with Energy Toolbase’s Acumen EMS™ controls software. Out of the box, the BYD – ETB system could participate in a demand response program by scheduling dispatch commands through the ETB Monitor platform. Additionally, the system is configured to optimize time-of-use (TOU) arbitrage savings when the customer elects to do so. Readmore about our Acumen EMS energy storage integration with BYD.
DOWNLOAD THEFULL CASE STUDY PDF