Trusted by Top Solar and
Energy Storage Professionals.

Client Impact

We Let Our Clients Do The Talking

Energy Toolbase allows me to turnaround proposals in a fraction of a time...

Albert Manning, REC Solar

What our clients say

Testimonials

Case Studies

Nexamp

The Challenge

Nexamp was looking to add an energy storage system to one of its several front-of-the-meter community solar farms in Massachusetts. 

The Solution

Energy Toolbase was able to provide an all-in-one, DC-coupled energy storage  system  comprised  of four Sungrow units, controlled entirely by ETB Controller with Acumen AI™ totaling 1,000 kilowatts (kW). 

Location

Deerfield, MA

ESS Provider

Sungrow

System Size

1,000 kW / 2,192 kWh

Deployment

February 2023

Facility type

Community Solar Farm

Application

Dynamic Dispatch

Ventura County

The Result

Hardware Uptime: 99.5%

EMS Uptime: 99.98%

The Challenge

Ventura County was looking for a solution that would allow it to keep water pumps on and supply water to county residents in case of an emergency. 

The Solution

Ventura Energy turned to Energy Toolbase to enable grid participation for the five sites and deployed standalone energy storage systems comprised of Tesla Powerpacks and Megapacks with ETB Controller.

Location

Ventura County, CA

ESS Provider

Tesla

System Size

3.7 MWh

Deployment

January 2024

Facility type

Critical Water Facilities

Application

Dynamic Dispatch

Sprocket Power

The Result

99.84% Hardware Uptime

100% EMS Uptime

The Challenge

Sprocket Power was working with a local Buick dealership looking to install solar, energy storage, and EV chargers and participate in various grid service demand response programs, including Con Edison’s Commercial System Relief Program (ConEd CSRP) and New York State Energy Research and Development Authority’s Distribution Load Relief Program (NYSERDA DLRP).

The Solution

Sprocket installed a Socomec SUNSYS HES L unit paired with ETB Controller controls software alongside a 52-kW solar system. The primary controls application was Demand Charge Management.

Location

Bedford Hills, NY

ESS Provider

Socomec

System Size

100kw/186kWh

Deployment

February 2024

Facility type

Car Dealership

Application

Dynamic Dispatch

The Result

Modeled Savings Achieved: 134.90%

EMS Uptime: 96.58%

The Challenge

HES Renewables, a San Diego-based project developer, was searching for a solution to reduce energy and demand charges at the host customer’s large distribution facility. The customer is a Fortune 500 beverage manufacturer. 

The Solution

HES Renewables and Energy Toolbase’s paired with a BYD CHESS unit, alongside a 435kWh SunPower solar system to reduce peak demand and spread self-generated energy use across more hours of the day. 

Location

San Diego, CA

ESS Provider

BYD

System Size

240kW / 532kWh

Deployment

January 2022

Facility type

Distribution Center

Application

Manual Dispatch